You are here
All Project Updates
Search
Search tips:
- This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
Pages
Green Link at School of Art + Design & Krannert Art Museum Funding Agreement
Associated Project(s):The goal of this project is to construct a green roof atop the Link Gallery between the School of Art + Design and the Krannert Art Museum. This project will be implemented primarily by students and faculty of the School of Art + Design and will be in a highly visible campus location. It will help reduce energy costs at the facility and provide rain water for the surrounding gardens. As Facilities & Services is expected to cover half the cost of resurfacing the roof, the Student Sustainability Committee is in favor of partially funding the proposal in the amount of $63,900.
Green Allerton Wood-fired Boiler Funding Agreement
Associated Project(s):The goal of this project is to replace a natural gas heating system at Allerton Park with an Outdoor Wood-fired Boiler System. This replacement will eliminate considerable CO2 emissions from the current system and result in substantial cost savings. The use of a renewable resource (wood) in place of a non-renewable one (natural gas), combined with the greenhouse gas emissions reduction will help increase campus sustainability, thus the Student Sustainability Committee is in favor of funding the full requested amount of $25,500.
Campus Recreation Water Conservation Funding Agreement
Associated Project(s):Water conservation initiatives have generally taken a back seat to energy conservation at the University of Illinois. Campus Recreation has proposed a comprehensive upgrade of restroom facilities in all three of their buildings, with the potential of reducing water consumption by almost 6.5 million gallons annually. This work would be highly visible to students and in a fellow student-fee supported unit. Thus, the Student Sustainability Committee is in favor of proving upto $30,000 in incentives at the rate of $0.30 per $1.00 spent.
Bike Parking Funding Agreement
Associated Project(s):The goal of this project is to fund installation of bicycle parking facilities at the Undergraduate Library, the Ag. Sciences Engineering Building and Freer Hall. Cycling is a sustainable form of transportation, highly used by the student body, and inadequately supported on campus. Thus the students sustainability committee is in favor of funding the full requested amount of $10,600.
Everitt Electrical Building
Associated Project(s):A total of 2,059 lighting fixtures in the Everitt Electrical Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF 2008 Lighting Retrofit. This will allow an Annual kWh Savings of 336,327 hours. The Simple Payback for changing the fixtures in the Everitt Electrical Building is 2.25 years.
Agriculture Engineering Sciences Building
Associated Project(s):A total of 1,236 lighting fixtures in the Agriculture Engineering Sciences Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 193,605 hours. The Simple Payback for changing the fixtures in the Agriculture Engineering Sciences Building is 2.36 years.
CCNet sustainability on campus
Associated Project(s):See attached
Attached Files:Henry Administration Building
Associated Project(s):A total of2,135 lighting fixtures in the Henry Administration Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 358,223 hours. The Simple Payback for changing the fixtures in the Henry Administration Building is 1.75 years.
Armory
Associated Project(s):A total of 2,046 lighting fixtures in the Armory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 312,561 hours. The Simple Payback for changing the fixtures in the Armory is 2.56 years. Occupancy sensors were also installed in this facility for further energy savings.
Mumford Hall
Associated Project(s):A total of 1,508 lighting fixtures in Mumford Hall were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 240,593 hours. The Simple Payback for changing the fixtures in Mumford Hall is 1.96 years.
Plant Sciences Laboratory
Associated Project(s):A total of 1,009 lighting fixtures in the Plant Science Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 159,182 hours. The Simple Payback for changing the fixtures in the Plant Sciences Laboratory is 3.25 years.
Madigan Laboratory
Associated Project(s):A total of 2,587 lighting fixtures in Madigan Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 401,383 hours. The Simple Payback for changing the fixtures in Madigan Laboratory is 2.35 years.
Loomis Laboratory
Associated Project(s):A total of 2,001 lighting fixtures in Loomis Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 316,267 hours. The Simple Payback for changing the fixtures in Loomis Laboratory is 2.61 years.
Materials Research Laboratory
Associated Project(s):A total of 2,253 lighting fixtures in the Materials Research Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 360,623 hours. The Simple Payback for changing the fixtures in the Materials Research Laboratory is 1.63 years.
Materials Science Engineering Building
Associated Project(s):A total of 893 lighting fixtures in the Materials Science Engineering Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF 2008 Lighting Retrofit. This will allow an Annual kWh Savings of 154,715 hours. The Simple Payback for changing the fixtures in MSEB is 3.99 years.
Mechanical Engineering Laboratory
Associated Project(s):A total of 1,395 lighting fixtures in the Mechanical Engineering Building were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 245,845 hours. The Simple Payback for changing the fixtures in the Mechanical Engineering Building is 1.77 years.
Talbot Laboratory
Associated Project(s):A total of 1,814 lighting fixtures in Talbot Laboratory were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 330,664 hours. The Simple Payback for changing the fixtures in Talbot Laboratory is 1.53 years.
Engineering Sciences Building
Associated Project(s):A total of 701 lighting fixtures in the National Soybean Research Center were changed from T-12 fixtures to T-8 fixtures as part of the ICECF Lighting Retrofit. This will allow an Annual kWh Savings of 110,376 hours. The Simple Payback for changing the fixtures in the Engineering Sciences Building is 3.04 years.
Project kick off
Associated Project(s):The kickoff meeting for the ISTC geothermal study was led by Todd Rusk at ISTC on March 9, 2009. The agenda was 1) to discuss the overall project objectives, tasks, and requirements and 2) to begin preparations for drilling the test wells.
Participants included: Tom Abram, Eliana Brown, Kenneth Hlinka, Thomas Holm, Michael Jeffords, David Larson, Tim Lindsey, Kent Reifsteck, Bill Shilts, Douglas Walker, and Angela Wisehart.