Skip to main content
iCAP Portal (**STAGING**)
Illinois Climate Action Plan (iCAP)
University of Illinois Urbana-Champaign
Expand
Main
menu
Expand
themes
Search
Main menu
Home
Objectives
Projects
Archived Projects
Project Status Listings
Theme: Education
Theme: Energy
Theme: Funding
Theme: Resilience
Theme: Zero Waste
Theme: Reporting Progress
Theme: Research
Research Opportunities and Projects
Theme: Transportation
Theme: Land and Water
Map
Suggestions
About Us
iCAP Themes
Energy
Transportation
Land and Water
Zero Waste
Resilience
Reporting Progress
Engagement
Education
Research
Funding
Search form
Search
Configure
Configure block
Search form
Search
You are here
Home
Projects
Project Listing
Project Listing
Perhaps you would be interested in the
Hierarchical Project Display
?
Theme
- Any -
Energy
Transportation
Land and Water
Zero Waste
Resilience
Reporting Progress
Engagement
Education
Research
Funding
Sort by
Theme
Title
Status
Order
Asc
Desc
Per page
10
20
50
100
- All -
Theme
Status
Project
Energy
Ongoing
LEED Certification
Energy
Ongoing
LED Exit Signs
Energy
Cancelled
Vet Med Miscanthus CHP Boiler
Energy
Ongoing
Solar Power on Campus
Energy
Proposed
Biogasification
Energy
Completed
FY12 RCx
Energy
Ongoing
Explore Options for 100 Percent Clean Campus Energy
Energy
Completed
Lighting Retrofit #5
Energy
Completed
Geothermal at the Campus Instructional Facility (CIF)
Energy
Proposed
Off-campus Solar Farm 3.0 PPA
Energy
Ongoing
Wind Power Purchase Agreement (PPA)
Energy
Ongoing
Biomass use on Campus
Energy
Completed
Kill a Watt Monitors at Libraries
Energy
Completed
Graduate Dance Space
Energy
Completed
Thermal Energy Storage (TES) Tank
Energy
Ongoing
Energy Conservation Incentive Program (ECIP)
Energy
Completed
Nugent Hall: LEED Silver
Energy
Completed
ECE Rooftop Solar PVs
Energy
Completed
Biomass Boiler at the Energy Farm
Energy
Cancelled
ISTC Geothermal Loop
Energy
Completed
Surveying Building: LEED Gold
Energy
Ongoing
Vending Machine Sensors
Energy
Completed
Geothermal Test Well at Energy Farm
Energy
Completed
Illini Union 104 & 222 Lighting
Energy
Completed
Chemistry Annex Renovation and Addition: LEED Gold
Energy
Completed
E37 Parking Lot Solar Lighting
Energy
Completed
SAIC projects
Energy
Proposed
Reduce Energy Consumption from Computer Rooms
Energy
Completed
Green Allerton Wood-fired Boiler
Energy
In Progress
Geothermal at WPP
Energy
Completed
2012 Exterior Doorway LED Lighting
Energy
Completed
KCPA Lobby Lighting
Energy
Ongoing
LED Exterior Lights
Energy
Ongoing
Update Building Maintenance Procedures to Support Long-Term Energy Savings
Energy
Ongoing
LED Street Projects
Energy
Completed
FY16 RCx
Energy
Completed
Plant Sciences Window Shades
Energy
Completed
FY09 RCx
Energy
Completed
NCSA Petascale: LEED Gold
Energy
Proposed
Rooftop Wind Generators
Energy
Cancelled
Solar Panels on Everitt Lab
Energy
Completed
Weatherization of Small Campus Buildings
Energy
Ongoing
Pipe Insulation
Energy
Completed
Geothermal at Allerton Park
Energy
Completed
Electrical and Computer Engineering Building: LEED Platinum
Energy
Completed
Presentations with Energy Liaisons
Energy
Completed
Uni High Gym Rooftop Solar PVs
Energy
Completed
SDRP Lighting
Energy
Cancelled
Art- East Annex Studio 1 Daylighting
Energy
Completed
Lincoln Hall Renovation: LEED Platinum
Pages
« first
‹ previous
1
2
3
4
5
6
7
8
9
…
next ›
last »