- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
Pages
- In house 3 binsAssociated Project(s):- Fabricated through our own mill shop. Cost to make two of these bins is attached. Attached Files:
- Outfitting main quads with 3-binsAssociated Project(s):- Members of the Zero Waste Team analyzed the main buildings in each of the three central quads. Locations of current 3-bins were noted as well as areas where more were needed. The plan is to transition away from single flow trash and recycling bins towards a system where only 3-bins are used in main hallways. This will ensure that there are well marked bins in highly visible areas and will condense the many bins that need to be serviced by university workers into fewer overall bins. Overall this initiative will lead to improved waste management efficiency and increased recycling rates across the campus. Attached Files:
- 3 Slim Bins placed at Micro & Nanotechnology labAssociated Project(s):- P1H08584 placed on first floor - P10H08583 placed on second floor - P10H08582 placed on third floor 
- 3 Slim Bins placed at Siebel Center for DesignAssociated Project(s):- P10H08580 placed on the first floor- East - P10H08581 placed on the first floor- West - P10H08585 placed on basement level 
- 1 Slim Bin placed at Materials Research LaboratoryAssociated Project(s):- P10H08574 placed in the Materials Research Laboratory 
- 1 Slim Bin placed at the Waste Transfer StationAssociated Project(s):- P10H08575 placed in Waste Transfer Station break room 
- 4 bins placed at Music Building - last of the 28 bin orderAssociated Project(s):- P10H08419 placed on Lower Level C0220 near stairs, P10H08418 placed on second floor C2220 against north brick wall, P10H08117 placed on third floor C3200 east wall/elevator landing, P10H08416 placed on fourth floor C4200 east wall/evelator landing. 
- 3 slim bins placed at Levis Faculty CenterAssociated Project(s):- P10H08422 placed on the second floor south side, P10H08421 placed on the third floor north side, and P10H08420 placed on the third floor south side. 
- 1 bin placed at Institute for Genomic BiologyAssociated Project(s):- P10G96450 placed in the cafe, 613, on the south wall near the TV monitor. 
- 1 bin placed at Engineering Sciences BuildingAssociated Project(s):- P10G96448 placed in the vestibule outside the bottom of the stairwell, C0192. 
- 1 bin placed at Materials Research LaboratoryAssociated Project(s):- P10G96449 placed at C100A. 
- 1 bin placed at National Soybean Research CenterAssociated Project(s):- P10H08415 on first floor outside 137, near lecture hall. 
- 2 slim bins placed at Krannert Art MuseumAssociated Project(s):- P10H08424 outside of room 62 in the basement and P10H0843 in 163C area where the old cafe space used to be. 
- 1 slim bin placed at Siebel Center for DesignAssociated Project(s):- P10G96447 lower lobby against the west wall. 
- 1 bin placed at Children's Research CenterAssociated Project(s):- P10G96446 C108 hallway by stairs. 
- 1 bin placed at Law BuildingAssociated Project(s):- P10G96445 on first floor near Pennsylvania Ave entrance. 
- 1 bin placed at Henry Administration BuildingAssociated Project(s):- P10G96444 placed near Room 364. 
- 3 bins placed at Roger Adams LaboratoryAssociated Project(s):- P10G96441 placed on ground floor, P10G96443 placed on second floor, P10G96442 placed on third floor. 
- 63 buildings on campus have at least one of the new 3-binsAssociated Project(s):- On March 27, 2023, it was recorded that 63 buildings across campus have at least one of the new 3-bins. 

 
 