You are here
Project Updates search results
Search tips:
- This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
- Associated Project(s):Attached Files:
Final Bike Sharing Feasibility Study Submitted to SSC
Associated Project(s):The final report for the Bike Sharing Feasibility Study was submitted to SSC. The study recommends the following three tiered approach to bicycle sharing on the Urbana-Champaign campus:
- Bikes available for employees – The small existing program at Kinesiology and Community Health should be replicated at departments throughout campus. The program needs to be approved by Legal Counsel, Risk Management, Purchasing, and interested Colleges. Then it should be promoted to departments, to encourage them to invest in bicycles for their employees and provide them with a simple support system for maintenance and tracking.
- Bikes available for short-term rentals – As an interim solution until the campus can handle a large-scale bike sharing program, the small existing program at Campus Recreation should be expanded with support from the Student Sustainability Committee. They should increase the number of bicycles available, make the program self-sufficient financially, and market the program to visitors, conference attendees, faculty, staff, and students. A similar program could be investigated for the Illini Union.
- Bike solutions for students and the public – Before this campus is ready to pursue a public bike sharing system, we must first address the issues regarding degraded infrastructure and the need for more bike safety education. Once these issues have been resolved, the campus should renew consideration of several options for bike sharing, such as bicycle libraries, kiosk systems, and GPS-enabled community bikes.
Attached Files:- Bikes available for employees – The small existing program at Kinesiology and Community Health should be replicated at departments throughout campus. The program needs to be approved by Legal Counsel, Risk Management, Purchasing, and interested Colleges. Then it should be promoted to departments, to encourage them to invest in bicycles for their employees and provide them with a simple support system for maintenance and tracking.
Student Sustainability Committee approves funding for the Solar Farm
Associated Project(s):The Student Sustainability Committee approved the Solar Farm funding of $1.05M over the course of three years.
Revolving Loan Fund approved for $250K for LED Exit Signs
Associated Project(s):The Revolving Loan Fund is approved to fund $250K in LED Exit Sign improvements. Here is the description of the project, as reviewed by the RLF committee:
======================================
This project will replace existing exit signs with efficient LED fixtures in approximately (14) campus buildings. As a result, energy use will be decreased, life safety systems will operate more reliably, and maintenance needs will decrease dramatically. This is a continuation of projects funded in FY07 and FY08. We are requesting funding in the amount of $250,000, although the work is very scalable and any funding amount can be successfully applied.
_________________________________________________________________
CRITERIA:
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
08. VISIBILITY - Very visible. Building users notice when exit signs are burned out and it may make them feel uncomfortable or unsafe. It also creates a negative impression of the pride we take in our facilities.
09. PAYBACK PERIOD - When replacing incandescent, the payback from energy savings alone is about 6-7 years. Replacement of fluorescent exit signs yields a payback of 8-10 years. However, the old signs also require maintenance up to 3 times per year. If one includes this expense, the overall payback improves to 1-2 years.
10. REDUCTION OF COAL - By reducing overall campus energy use, this will contribute to Abbott Power Plant s ability to reduce the number of generation units in use. An additional benefit is the reduction in GHG emissions from maintenance vehicles traveling to replace burned out lamps.
11. FUND SIZE IMPACT - F&S is working with the Illinois DCEO and this project would qualify for about $7,000 in grant rebates.
12. PROJECT COORDINATION - F&S has a record of success with these projects. We have developed a project execution method that keeps overhead to a bare minimum, avoids expensive consultant fees, purchases material at bulk prices, and achieves maximum labor efficiency. F&S Construction Services will execute the work, and F&S Engineering will document results for the DCEO grant.
_________________________________________________________________
ISSUES:
¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯¯
01. REPLACEMENT OF FACILITY SYSTEMS - Existing exit signs are typically long past their expected life, and have many maintenance problems. The new LED exit signs will have an expected useful life of at least 15-20 years.
03. IMPACT ON PLANNED PROJECTS - Very little impact on capital projects. We coordinate to ensure no overlap between buildings selected for exit sign replacement and planned major renovations.
04. WHAT IF PROJECT IS NOT FUNDED? - If this project is not funded, our campus will continue to expend many maintenance hours keeping these lights operational, and waste electricity on inefficient technology that is over 20 years outdated.
If this project is partially funded, we will install as many LED exit signs as possible with the funds allocated.
06. WHAT OTHER DEPARTMENTS ARE AFFECTED BY THE PROJECT? - The buildings we propose are all across campus and used by virtually every college and department. These units will benefit from improved safety and fewer maintenance disruptions.
07. RISK FACTORS - No known risk factors. In fact this work will reduce the risks associated with having nonfunctioning exit signs, and improve life safety for the campus community. We have executed this type of work in 25 buildings so far without major problems.
Imported Swine Research Laboratory
Associated Project(s):As part of the Lighting Retrofit #5, 323 T-12 fixtures in the Imported Swine Research Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 50,918 hours. The simple payback for this project is 3.56 years.
ACUPCC tweets about UI Solar Farm
Associated Project(s):The American College and University Presidents' Climate Committment picked up the UI Solar Farm project on twitter.
Channel 3 shares info about UI Solar Farm
Associated Project(s):Channel 3 news shared the story of the UI Solar Farm on TV and on the Illinois homepage website.
Channel 15 does interview about UI Solar Farm
Associated Project(s):Channel 15 news interviewed Morgan Johnston about the UI Solar Farm. The news report showed on Channel 15 on Friday, November 09.
News-Gazette article about UI Solar Farm being approved
Associated Project(s):The News-Gazette had an article about the Board of Trustees approval of the Solar Farm.
Labor & Employment Relations
Associated Project(s):As part of the Lighting Retrofit #5, 179 T-12 fixtures in the Admin Tech Info Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 29,829 hours. The simple payback for this project is 3.48 years.
Institute for Government and Public Affairs
Associated Project(s):As part of the Lighting Retrofit #5, 229 T-12 fixtures in the IGPA were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 35,627 hours. The simple payback for this project is 3.61 years.
Board of Trustees approves Solar Farm
Associated Project(s):The Board of Trustees for the University of Illinois approved the purchase plans for the Solar Farm on Thursday. The next steps are to complete the Development Agreement, Land-Lease Agreement, and Power Purchase Agreement. Once these are completed, the Solar Farm vendor will begin the design and implementation of the Solar Farm at the southwest corner of Windsor Road and First Street. The entire site should be completed and operational by the end of 2013.
Board of Trustees approves solar farm
Associated Project(s):The Board of Trustees for the University of Illinois approved the Solar Farm purchase.
WILL does interview about Solar Farm
Associated Project(s):Jeff Bossert at WILL Public Radio interviewed Morgan Johnston about the Solar Farm. The interview was recorded and will be on the radio.
News-Gazette article about site selection
Associated Project(s):The News-Gazette published a follow-up article about the Solar Farm site selection. The article is online.
CAD Drawings requested for remaining 9 locations
Associated Project(s):Transportation Demand Management staff designed sketches and submitted a work order request to have formal CAD drawings made for the remaining 9 bike parking locations to be upgraded from donut hole style racks to "U" racks.
News-Gazette Article describes Solar Farm
Associated Project(s):The News-Gazette contacted SSC members and F&S to get an overview of the Solar Farm project as discussed at the BOT Audit, Budget, Finance, and Facilities sub-committee meeting. The article is online.
It was also picked up by the Chicago Tribune, Danville Area Connect, I4U, as well.
Atmospheric Sciences Building
Associated Project(s):As part of the Lighting Retrofit #5, 221 T-12 fixtures in the Atmospheric Sciences Building were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 34,365 hours. The simple payback for this project is 3.83 years.
Meat Sciences Laboratory
Associated Project(s):As part of the Lighting Retrofit #5, 367 T-12 fixtures in the Meat Sciences Laboratory were replaced with more energy-efficient T-8 fixtures. This switch will incur an Annual kWh Savings of 66,103 hours. The simple payback for this project is 2.91 years.
F&S discussions with SSC continued
Associated Project(s):The Student Sustainability Committee met with F&S and exchanged letters and draft letters before finalizing the funding approval for the Solar Farm. Some of the related files are attached here.