You are here
Project Updates search results
Search tips:
- This form will search for words in the title OR the description. If you would like to search for the same term(s) across both the title and description, enter the same search term(s) in both fields.
- This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
- Associated Project(s):
Work order for MSEB occ sensor work
Associated Project(s):Work Request 141288 converted to Work Order 10288695
Work Order: 10288695
Building: 0034 - MATERIALS SCIENCE AND ENG BLDG
Room:
Department Reference:
Customer Description:
Please provide engineering design services to install lighting occupancy sensors and HVAC occupancy sensors in the Materials Science and Engineering Building (MSEB). Charge CFOP 1-762417-862004-xxxxxx-198000.
Phases:
Phase: 001 DESIGN SERVICES
Penn State wins Big Ten CCN competition
Associated Project(s):Hello Big Ten CCN competitors!
CCN officially ended on April 25th and the results were published yesterday. Congratulations to Penn State University on taking the lead of Big Ten Unplugged with an overall 3.3% electricity reduction during the competition. Penn State University was also a winner in the poster category.
Taking 2nd place was Ohio State University with a 3.1% reduction. 3rd place goes to University of Wisconsin - Madison with a 2.2% reduction. Congrats to our top 3 Big Ten Unplugged winners!
I'd like to propose that we continue a Big Ten Challenge in the future not only for CCN but any nationwide competition focused on resource reduction. I will propose a meeting for us some time in late summer to outline what future competitions within Big Ten might look like.
Best,
Stacey White
Sustainability CoordinatorUniversity Services
University of Minnesota
Office: 612-624-3285
Cell: 612-978-0843
Fax: 612-625-4133
May 2014 assessment
Mode Shift update
Associated Project(s):CUUATS completed a University District Traffic Circulation Study, using information from a campus-wide statistically relevant survey.
The following table shows the mode share information based on the survey conducted in April-May, 2011.
Level
Travel Mode (%)
Walk
Bike
Transit
Drive Alone
Carpool
Get a Ride
Other
Faculty
9
18
10
51.9
9
1.9
0
Staff
5.4
6.4
9.1
65.2
9.7
3.5
0.6
Freshman
50.2
12
34.8
0.7
0.2
0.7
1.4
Sophomore
53.1
9.1
34.1
1.6
0.3
0
1
Junior
48.5
12.6
28.8
8.6
0.6
0.9
0
Senior
49.1
10.5
27.1
11.2
1.4
0.4
0.4
Masters
23.4
13
41.3
18.4
2.1
1.8
0
PhD
20.1
15.2
39
20.8
3.4
1.6
0
Attached Files:suggestion for water conservation
Associated Project(s):From: Rajagopalan, Nandakishore [mailto:nrajagop@illinois.edu]
Sent: Friday, May 02, 2014 10:18 AM
To: swat-water@dib.illinois.edu
Subject: oxijet water nozzleA suggestion from someone in the UI physics department.
http://www.felton.co.nz/?sid=2152
The Felton Oxijet™ volumises the stream with air giving you a more luxurious shower.
Traditional flow restrictors work by simply reducing flow and pressure, whereas the Oxijet™ uses flow energy to draw air into the water stream.
potential student challenge
Associated Project(s):From: Amy Liu [mailto:amy.linqin.liu@gmail.com]
Sent: Friday, May 02, 2014 11:41 PM
To: Johnston, Morgan B
Cc: swat-water@dib.illinois.edu
Subject: Re: EPA Campus RainWorks ChallengeThis is really interesting, I will look into this. Thanks!
On Fri, May 2, 2014 at 10:15 PM, Johnston, Morgan B <mbjohnst@illinois.edu> wrote:
Hi Water SWATeam,
One of the potential water-related projects for campus could be this student competition: http://water.epa.gov/infrastructure/greeninfrastructure/crw_challenge.cfm.
What do you think?
Thanks,
Morgan
Sustainable Landscapes proposal
Associated Project(s):Dear ALUFS SWATeam,
Evan DeLucia has asked me to share with you some ideas being propounded by Bruce Hannon (bhannon@illinois.edu). Bruce is advocating the establishment of a central authority for sustainable landscaping, preferably at the University level, to approve landscape designs, implement a shift towards native species, and coordinate fundraising. I personally find all of the objectives he has in mind to be attractive ones, but it's not obvious to me whether the mechanism he proposes is the best one to further those objectives. I attach three documents from Bruce for background.
In any case, I would like to recommend that your team meet with Bruce and discuss his vision. That discussion, in addition to others you may have with other experts and stakeholders, might lead to a formal recommendation from your team that iSEE could route through the emerging process for campus sustainability recommendations.
Cheers,
Ben
Q&A with Tim Mies and Mike Marquissee
Associated Project(s):From: Marquissee, Mike
Sent: Tuesday, April 29, 2014 11:22 AM
To: Mies, Timothy A; Anderson, Gary L; Dale Johnston (dkjohnst@igb.illinois.edu)
Subject: RE: Copy of UofI propane 040414-MLM EDITS.xlsTim,
See answers below.
Mike
From: Mies, Timothy A
Sent: Tuesday, April 29, 2014 9:01 AM
To: Marquissee, Mike; Anderson, Gary L; Dale Johnston (dkjohnst@igb.illinois.edu)
Subject: RE: Copy of UofI propane 040414-MLM EDITS.xlsHi Mike,
Several questions have come up that I would like you input on in regards to the green revolving loan fund in cases that might occur that do not follow the typical project pattern.
Scenario 1) The energy farm reverts to another department at the completion of the grant of the Energy Biosciences Institute before the loan is repaid. How would the loan be handled in cases where the new department weren’t within the VCR cost area?
- Since the loan is being repaid from the campus pool in favor of the VCR, it is likely that it would still pay out in favor of which other campus department it goes to. Unless it turns into a self-supporting entity, which is unlikely. In that unlikely event, the self-supporting entity would repay the loan.
Scenario 2) A crop loss occurs one year that would limit/prevent the savings that are estimated from our initial estimates?
- The Campus utility pool would still pay out. Just that the savings would not be recognized. It would also pay for the additional propane. The loss would not come out of the project.
Scenario 3) Miscanthus ceases to be produced on the energy farm, resulting in no more mxg produced locally? Would F&S then consider purchasing MXG from a local farmer who could supply the material? Assuming the boiler installed could handle multiple feedstocks, wood chips may be an alternative.
- We support this project because there is a research project attached to it. If that project is discontinued, we would then have to discuss who repays the loan. Most likely it would be out of the research fund, then, which would also pay for the restoration of the site and so on. I don’t think we would be interested in providing alternative fuel sources or manage an abandoned research project.
Thanks for your input.
Tim
Request to SWATeam
Associated Project(s):Hello waste SWATeam and Ben,
As you know, the iCAP called for a Zero Waste Policy to be developed, and we have a draft for a CAM policy (attached).
I’m not sure a CAM policy is the best solution, so I asked around for information about where campus policies usually reside and I was given the following info. As the SWATeams are approved to move forward to the next phase, it would be great to have iSEE and the iCAP SWATeam take the lead on getting a formal Zero Waste Policy adopted.
- Campus Administrative Manual: http://cam.illinois.edu/
- Policy and Rules for Civil Service Staff: https://nessie.uihr.uillinois.edu/cf/policies/index.cfm?Item_id=390
- State Universities Civil Service System Statute and Rules: http://www.sucss.illinois.gov/sar.aspx?osm=c43
- Business and Financial Policies and Procedures: http://www.obfs.uillinois.edu/bfpp/
- Senate Resolutions – difficult to enforce
- Chancellor directives (ex. LED Campus)
Ben, Bart, and I have discussed this over the last few months, and I believe it is most appropriate advancing to campus decision makers through the iCAP process rather than through F&S. Please let me know what you think.
Thanks, Morgan
---------------
Dear Purchasing, Waste, and Recycling SWATeam, I just wanted to add my $0.02 that I concur with Morgan that it makes sense to pursue the review and approval of a Zero Waste Policy through the SWATeam process, and your team is clearly the right one for this task. Cheers, Ben
----------------
I like the idea. If there is an agreement, we can discuss the policy itself in our next meeting.
Regards,
-Dilip Chhajed ------------ I'm in. - Warren Lavey
Attached Files:Urbana receives an energy award
Associated Project(s):Urbana Awarded for Business Energy Efficiency
Contact: Scott R. Tess
706 S. Glover Ave.
Urbana, IL 61802
Tel. (217) 384-2381
Email: srtess@urbanaillinois.us FOR IMMEDIATE RELEASE—April 28, 2014
Ameren Illinois has honored the City of Urbana and its businesses with Ameren’s 2013 Most Progressive City award.
The annual award is given to cities demonstrating extraordinary accomplishments in energy efficiency. Forty-five Urbana Businesses participated in Ameren Illinois’ energy efficiency rebate program, ActOnEnergy, in the 2013-2014 program period. These businesses completed 94 energy saving projects totaling 2,253,926 kWh of electricity and 148 therms of natural gas.
By participating in ActOnEnergy, Urbana businesses received $99,872 in incentives and will save $157,920 in annual energy costs.
The City of Urbana’s Climate Action Plan has been guiding a number of energy saving activities including Tax Increment Financing incentives for energy efficiency upgrades to buildings as well as training and technical assistance through the Urbana-Champaign ENERGY STAR Challenge.
As part of the award, Urbana received four street signs to place at entrances to the city identifying Urbana as Ameren Illinois’ 2013 Most Progressive City.
For more information, please visit http://urbanaillinois.us or contact Scott Tess at 217-384-2381 or srtess@urbanaillinois.us.
Registration events at Residence Halls
Associated Project(s):Schedule
Monday, April 28, 11AM-2PM
Student Dining and Residential Programs (SDRP) Building
Tuesday, April 29, 11AM-2PM
Illinois Street Residence Halls (ISR)
Wednesday, April 30, 11AM-2PM
Allen Hall/Lincoln Avenue Residence Hall (LAR)
Thursday, May 1, 11AM-2PM
Pennsylvania/Florida Avenue Residence Hall(s) (PAR/FAR)
Final Report
Associated Project(s):Morgan,
The closing report is attached for your review.
The celebration for Barton (and the organization team) is May 7th in Clark hall rooms A&B from 6-7 pm,
The trophies are ordered and scheduled to be given to building team captains at the celebration.
~Paul Foote
Attached Files:construction schedule
Associated Project(s):Prof. Hall, Teresa and Morgan,
Just a quick update – we held the initial site meeting with contractors yesterday. Prof. Chasco was in attendance as we toured the building and discussed construction plans.
At this time work is projected to begin about May 19th. Any questions on construction or schedule are best directed to Josh Rubin who will be overseeing the work.
Of course you can always contact me with technical questions or anything else on your mind.
Regards,
-Eva
"Connectivity and Accessibility of UIUC Campus Bike Paths"
Associated Project(s):"The results here indicate that the changes to the UIUC network do in fact improve connectivity over the existing network. Moreover, the planned network lowers the average shortest-distance path between libraries, dormitories, and the Union by nearly the same amount as a control scenario without paths at all. While we may assume that a bicycle master plan will address and improve connectivity as a matter of course – and the language in the plans claims that they do – it seems counterintuitive that this simple test not be included in the research process to confirm that this is so. Ultimately what these accessibility and connectivity analyses show is that while planners and bicycle advocates may seek to improve bicycle infrastructure, we need a way to quantify and subsequently verify that any changes will improve the functionality of the network and the ease with which a rider can travel from one location to another." -- Pildes, Russell. (2014) "Connectivity and Accessibility of UIUC Campus Bike Paths", B.A. Honors Thesis, Department of Geography and Geographic Information Science, University of Illinois at Urbana-Champaign.
Attached Files:email to participants
Associated Project(s):Happy Bike Census Day,
Thank you so much for participating in the April 2014 Bike Census!
We are really excited to get a hold of the data you collected it and to tally the count.
Today (Wednesday) after 8PM and tomorrow (Thursday) before 6PM would be ideal. If you could please send me times when you know you will be at home or in an office, I will definitely try to stop by and pick it up then. I could also meet you at a specific time and place. Feel free to give me a call if that is easier.
If it's easy, you could also scan and email it to me.
Thanks again for participating! If you didn't get a t-shirt, please let me know and I will bring you one.
Andy
Andy Kopp
Campus Bicycle Planning Intern
University of Illinois at Urbana-Champaign | Facilities and Services
Overview of SWATeams SP14
Associated Project(s):In collaboration with Facilities & Services, iSEE is establishing six teams consisting of faculty, staff, and students to examine the six broad themes within the Illinois Climate Action Plan. The teams are currently finalizing assessments of how the campus is doing in meeting its pre-2015 iCAP targets.
In the near future, the SWATeams will transition into recommending concrete steps the campus should take to meet its iCAP targets, as well as developing suggested revisions to the iCAP. A procedure is currently being finalized within the campus administration to evaluate and endorse SWATeam recommendations; more details should be available soon.
Each SWATeam, once fully populated, will have two faculty members (one serving as chair), two staff members, and two students. Each team also has an iSEE intern serving as a "clerk" for the group. In the near future, each SWATeam will also populate a "consultation group" of experts and stakeholders across campus to provide input and feedback to the SWATeam.
The current membership of the SWATeams (clerks shown in square brackets) is:
TopicFaculty
Staff
Students
Energy Conservation and Building Standards
[Claudia Szczepaniak]Brian Deal
Josh Whitson
Karl Helmink
Claire McConnell
Dhara Patel
Energy Generation, Purchasing, and Distribution
[Ben Reeber]Scott Willenbrock
Mike Larson
Tim Mies
Drew O’Bryan
Nathan Wells
Transportation
[Ben Cigelnik]Wojtek Chodzo-zajko
Pete Varney
Rick Langlois
Bryce Davis
Adam Dornford
Agriculture, Land Use, Food, and Sequestration
[David Gu]Bruce Branham
Neal Merchen
Dawn Aubrey
Alexandra He
Amanda Jacobs
Water
[Candice Stefani]Keith Erickson
Kishore Rajagopalan
Amy Liu
Lance LangerPurchasing, Waste, and Recycling
[Guy Urgo]Warren Lavey
Dilip Chhajed
Bart Bartels
Matt Murphy
Olivia Webb
progress report on 2010 iCAP
Associated Project(s):This report was developed by Morgan White and Stephanie Lage, from F&S and iSEE, respectively.
Attached Files:ARC approval
Associated Project(s):From: Lev, James R
Sent: Monday, April 21, 2014 3:52 PM
To: Bartels, Bart A
Cc: Johnston, Morgan B; Architecture Review Committee
Subject: RE: Reycling in the QuadBart,
ARC approves of the new recycling program using the two containers at 30 Quad locations. We understand that this is an experimental program to encourage recycling. Please keep us informed as to the success of the program.
Jim
ARC approval
Associated Project(s):From: Lev, James R
Sent: Monday, April 21, 2014 4:37 PM
To: Geoffrey Chambers
Cc: Eller, Jonathan Randall; Johnston, Morgan B; Architecture Review Committee
Subject: RE: Approval for SSC Proposal: Shelter Bicycle Parking for CLSL and RALGeoff:
Thank you for your summary and request for review comments on your proposed project.
ARC finds no significant issues with the proposed locations of a cover bike shelter adjacent to the Chem Life Sciences Building.
ARC would want to consider shelter designs on a location by location basis. The shelters may not be acceptable everywhere on campus. Each site would need to be considered on its own merits and appropriateness of design. We would like to see a proposal for these two suggested locations: size, location, number of racks, costs and the design. We’d like to see what you have in mind.
Thanks for bringing this to our attention.
Jim