  • This form will search for any of the words you enter in a field, not the exact phrase you enter. If you would like to search for an exact phrase, put double quotes (") around the phrase. For example, if you search for Bike Path you will get results containing either the word Bike OR the word Path, but if you search for "Bike Path" you will get results containing the exact phrase Bike Path.
  1. update from Joyce Mast

    Associated Project(s): 

    From: Mast, Joyce C
    Sent: Wednesday, June 26, 2013 9:32 AM
    To: Beverage, McKenzie; Johnston, Morgan B
    Subject: RE: ECE Solar Installation Status Update

    McKenzie,

    Thank you for checking with me about the status of the Solar Installation on the North Parking Garage. I expect that no funds will be spent on the SSC account before the end of the fiscal year. We need results from the feasibility study for placing the panels on the North Parking Garage roof before we will be spending money on the panels or installation.  The study is to be officially completed by September 6, 2013, but we expect to  have drawings and plans by July. This will give us enough information to seek more matching funds so that the panels may be installed in time for the July 2014 completion date for the new building.  

    Best regards,

    Joyce Mast

  2. First Harvest!

    The first flush of both red currants and raspberries ripened up this past week, and we were able to harvest our first calories from the WPP Research Site. Once yield and nutrition data are collected, all crops from the site, including the berries harvested this spring, are sold to University Dining Services for use in both catered campus events as well as the student dining halls. When sufficient quantitates are available, WPP crops will also be sold at the Sustainable Student Farm market stand on the quad side of the Illini Union (Thursdays, 11am-5pm).

    There are still plenty more raspberries to come this summer, as well as a solid crop of black currants and grapes!

  3. bike parking review meeting

    Associated Project(s): 

    Stacey DeLorenzo, Amelia Neptune, Morgan Johnston, and Noel Grove met to review the bike parking estimates for this project.  There are a few locations where the pavement is in terrible condition, so we discussed options for handling those locations.  The racks could be installed on rails, or the pavement could be replaced.  There were also a few locations where there are conflicting major projects occuring in the near future.  Stacey will talk to the project managers for those sites to work through the solutions for the bike parking installation.

    Additionally, this project includes the installation of one bike fix-it station at Allen Hall.  Amelia began this work and Stacey will take it over now.  Stacey and Amelia will meet with Sean Sullivan in the SSC to provide him with an update.  Noel Grove will provide cost break downs with the pavement work separate from the bike rack installation work.  He will also contact the Iron Workers to discuss options for racks on rails built in-house.

  4. Building removal

    Associated Project(s): 

    There are three buildings on the site of the future Solar Farm.  The SSC requested that the Timber Frame barn be salvaged, rather than demolished.  The company that is the preferred vendor for this work provided this detail:

    It would be our intention to reuse 100% of the wood components.  We would re-erect the building as it stands with only modifications being to the interior layout spacing.    We will recycle the steel roofing.  We would handle the concrete in non-landfill manner; planned use is as a fencing fill for the new owner.  Battens and doors and any exterior wood treatments would be reused in the re-newed structure.  Although the nails will not be reused in the re-erection of the building, they have been allocated to go to a local BFA candidate.

  5. 2009 Classroom Occupancy Sensor Installation

    Associated Project(s): 

    In 2009, the Student Sustainability Committee awarded $50,000 to Facilities & Services for installation of occupancy sensors to control lights in ten campus buildings: Animal Sciences Laboratory, Architecture Building, Bevier Hall, Chemistry Annex, Huff Hall, Materials Science and Engineering Building, Mumford Hall, Music Building, Noyes Laboratory and Transportation Building. The funds were used to install a total of 230 occupancy sensors in 223 rooms in these ten buildings.

  6. 2008 Classroom Occupancy Sensor Installation

    Associated Project(s): 

    In 2008, the Student Sustainability Committee awarded $20,000 to Facilities & Services for installation of occupancy sensors to control lights in three campus buildings: Loomis Laboratory, Foreign Languages Building, and Armory. Later, the budget was increased to $50,000 and the scope expanded to include seven additional buildings: Davenport Hall, Everitt Electrical Building, English Building, Henry Administration Building, Psychology Laboratory, Mechanical Engineering Building, and Wohlers Hall. The funds were used to install a total of 332 occupancy sensors in 272 rooms in these ten buildings.

  7. Teresa Tousignant requests meeting

    Associated Project(s): 

    Here are the proposal and supporting documents for the TBH lighting project.   The account number has been set up so the project now has access to the funds.   I’d like to get this project into the lighting design and electrical engineering pipeline as soon as we can.  I’d also like to call a project kickoff meeting so we can sit down with Prof. Hall, Director Chasco, and Eva Sweeney and make sure everyone is on the same page.

    Teresa Tousignant
    Student Sustainability Committee

    Energy Working Group Co-Chair

  8. potential water reuse at NCPD

    Associated Project(s): 

    From: Lev, James R
    Sent: Saturday, June 08, 2013 8:21 AM
    To: Reeser, Doris Jean
    Cc: Kim, Qu; Bundren, Brian Christopher; Johnston, Morgan B
    Subject: U13038 NCPD - install solar array - conceputualization (U-1937)

    We have an opportunity in this project at the Parking Deck that I want to put on the table right away as it could affect the other projects underway on the ground floor of the building. 

    the parking deck solar array project will provide energy capacity to the ECE project in its goal to achieve net Zero status.  it will also provide power for new LED lighting throughout the parking deck. 

    We will be collecting or harvesting rainwater from the proposed solar array project on the top parking deck.  at this time the plan is to direct the water directly into the drainage system for the building.  this would be the sanitary system since the water on the decks have runoff from vehicles.     

    At little expense this water could be redirected and used for irrigation or flushing toilets on the ground floor.  this would require some storage capacity somewhere in the structure and some alteration to the water supply piping.   splitting the water supply piping between potable water and flushing water would need to be done now for that option to be used on the first floor..   otherwise this potential use of harvested water could be installed later.

    Paul Foote has told me that there are grants available to pay for this type of conservation measure. 

    Is this worth investigating at this late date in your projects?

    It seems to be an opportunity that fits well with everything that is being done at the parking deck.  I felt that I should at least raise the question and not miss an opportunity for a sustainable addition to the facility.

    Jim

    James R. Lev AIA

    Architect, Capital Planning

    Facilities & Services

    University of Illinois

    Champaign, Illinois

  9. meeting updates

    Associated Project(s): 

    Yesterday’s meeting covered more refined and detailed breakdown of the following topics, most of which were discussed in prior meetings, with the exception of the newly introduced structural support “Space Frame” option.

    • Panel layout configurations for truss mounted structural frame- 4 sections of seven rows at approx. 100 modules/row or four sections of six rows also 100 modules each. Truss mounting providing specific spacing for mounting dimensions. Also mentioned types of Truss material recommending tubular over welded angle, siting weatherization, degradation, appearance and animal habitat prevention as main reasons.
    • Space Frame structure was introduced as a favorable option.
    • A space frame is a structure system assembled of linear elements so arranged that forces are transferred in a three-dimensional manner. In some cases, the constituent element may be two dimensional.
    • Macroscopically a space frame often takes the form of a flat or curved surface.
    • It should be noted that virtually the same structure defined as space frame here is referred to as latticed structures in a state-of-the-art report prepared by the Task Committee on Latticed Structures [2], which states
    • A latticed structure is a structure system in the form of a network of elements (as opposed to a continuous surface). Rolled, extruded or fabricated sections comprise the member elements.
    • Another characteristic of latticed structural system is that their load-carrying mechanism is three dimensional in nature.
    • Space frame benefits although more costly up front were presented as prefabricated, galvanized and powder coated, sturdy, longer Life cycle and less maintenance, but requiring cranes and other installation costs. They also have installer requirements for mounting solar array as to maintain the integrity of the coating and protective surfaces. Provided flexible mounting spacing to help maximize power output and minimize shading.
    • Inverter layout revisited with schematic diagram presented illustrating component placement and wiring layouts.
    • An overall electrical schematic was presented identifying key component placing and overcurrent protection limits and needs, along with electrical room Layout.
    • Metering usage stated existing meters could be utilized with the addition of a revenue grade power production meter to monitor the array output.
    • Single line diagram was presented identifying current and project components, mentioning the output potential of 1400-1600 amps at 480 volts.
    • Introduced idea of rainwater harvesting for irrigation or toilet flushing usages.
    • Procurement procedures mentioned and moved as major topic for next meeting with concerns of turnkey type purchasing being the industry norm verses purchasing standard variety purchasing from multiple vendors in normal construction.
    • Next meeting PEP is having the structural Engineers present design considerations, and Mr. Jim Lev will have construction procurement representative attend.
  10. F&S internal meeting to address EV charging stations

    Jack Dempsey, Pete Varney, Michelle Winters, Pam Voitik, and Morgan Johnston met to discuss options for supporting EV charging stations for public use on campus.  It is unethical to allow UI resources to be used for personal needs, so the UI power cannot be freely distributed to Electric Vehicle owners.  A public charging station will need to include a payment mechanism.  Michelle Winters and Morgan Johnston will work on a plan for implementing public EV charging stations on campus.

  11. NCPD conceptualization mtg

    Associated Project(s): 

    Today’s meeting covered LED fixture questions and concerns:

    They presented data and layout with luminescence patterns for 2 fixtures one costing $400. 00/fixture and another $1000.00/fixture. It was mentioned that we need dimming features but no specifics on how or the criteria for that.

    Also covered were:

    • different configurations for trusses and rows of PV modules, scaffolding, and height and spacing requirements for same.
    • The module size and efficiency requirements needed to create 1600(Mwh) of power annually, along with quantities per different sq/ft
    • Drainage for the snow and rain off of the modules, along with snow removal equipment in the bay areas
    • Shading impact due to elevator towers, and overlapping rays during the winter months effecting production and how to handle these issues
    • Central inverter scheme being the most effective and the optional layouts and wiring for same.
    • DC combiner boxes layout scheme and wiring to reduce the effects of shading on power production
  12. Farm Stand on the Quad begins Thursday

    Associated Project(s): 

    The Sustainable Student Farm, a program of the Student Sustainability Committee, and in cooperation with the Illini Union, will begin its weekly Farm Stand on the Quad on Thursday (May 23). The Farm Stand is open every Thursday from 11 a.m. to 5 p.m., selling fresh produce grown on campus. The Farm Stand is located on the south side of the Illini Union.

  13. New Shop Manager Hired for Campus Bicycle Shop

    Associated Project(s): 

    James Roedl has been hired as the new Campus Bicycle Shop Manager, replacing Ken Sutto.  James' first day of work is May 28, 2013. Ken's last day is June 14, 2013, giving the two managers roughly 3 weeks of overlap for training and orientation. The shop will remain open during regular hours, Monday-Thursday, 2-6pm and Friday, 2-5:30pm. The Campus Bicycle Shop Manager reports to the Sustainability Coordinator in Facilities & Services (Morgan Johnston), and is funded jointly by the University and The Bike Project of Urbana-Champaign. James can be contacted at jmroedl@illinois.edu

  14. No-Mow Signage

    Associated Project(s): 

    The University campus has designated several different areas as No-Mow Zones. There is signage at these locations that explains that the area is a no-mow zone and the benefits of no-mow zones.