You are here

Standard Project Layout

This is the default layout most projects will use.

Campus Rec Water Conservation Incentives

The aim of this project is to reduce the water consumption of Campus Recreation patrons without interfering with the service they receive. In order to do this, standard flush valves were replaced with dual-flush valves, pint-flow urinals were installed, and motion-sensor water faucets replaced traditional faucets in ARC, CRCE, and the Ice Arena (which are the three largest Campus Recreation facilities.)  Campus Recreation used the upgrades as an opportunity to educate their patrons about water consumption and conservation.

Chip PC Thin Client

Thin client computing devices and servers have low power consumption and increased lifetime as compared to ordinary desktop computers. The Student Sustainability Committee allocated $7,000 (on a reimbursement basis) to the purchase of these thin client computing devices and a server to be used in public access areas, for testing, in student kiosks, and for loans to other departments to encourage widespread adoption of this technology. The Student Sustainability funding allowed for the purchase of 28 of the 40 total units on campus.

'UI Bikes' LINC Class

Each semester, Facilities & Services works with the Learning in Community (LINC) program as a project partner for the UI Bikes course section. Working closely with the Campus Bicycle Coordinator, students learn about cycling issues on campus including planning, infrastructure, safety, education, and enforcement. 

Storm Drain Murals

Drawing attention to stormwater – literally – is a current goal of F&S Environmental Compliance (EC). EC, which manages the university’s stormwater program, along with a number of community organizations, has recruited 12 artists to paint themed murals near storm drain inlets to call attention to the potential hazards of what washes down our drains.

Campus Honors House

The yard of the Campus Honors House was transformed into a beautiful landscape of native plants, with the efforts of a dedicated student. Native plants on campus have become an interest of several students and community members. With their dedication, the use of native plants continues to spread on campus.

Charge for "true cost of water"

One of the water strategies outlined in the 2010 Illinois Climate Action Plan was to include “true cost of water” charges with the energy billing program. The idea behind this strategy was to add an economic benefit in reducing the amount of water used by the University.

The University’s decision about whether or not they will implement this strategy is still being discussed.

Oak Street Chiller Plant ESCO

This project will be a guaranteed energy savings contract to be completed in conformance with the provisions of the public university energy conservation act. An energy services company (esco) will be selected through a request for proposal process to serve as a qualified provider. The esco will provide an investment grade audit and recommend energy conservation measures based on merit. This is approximately a $4,300,000 performance contract guaranteed to produce an annual energy savings of $850,000.

Pages

Subscribe to RSS - Standard Project Layout