  • 1/15/2021
    The geothermal heat pump is now installed at the Gable Home, at the Energy Farm. Professor Yun Yi will create an energy model, and Mark Taylor said, "I can work with one of my RA’s to draw up the system in a 3D model for use in presentations and...
  • 1/7/2021
    The supplier of the heat pump, Connor Company, has received it from the factory and will deliver it to campus on Friday, January 8, 2020. Lanz Inc. will then work to install the system.

Description

The Solar Decathlon House at the Energy Farm, called the Gable Home, is now equipped with a horizontal loop geothermal energy system. The loop is 3/4 inch.

No description has been provided yet.

Project Team

  • Primary Contact:

    Tim Mies

    Team Members:

    • Mark Taylor
    • Wes Ifft, Lanz Inc.
    • Andy Stumpf
    • Jeff Hurst, Connor Company
    • Tim Stark
    • Maryam Ghadiri
    • Abedalqader Idries
    • Yu-Feng Lin
    • Yun Yi

Dates

  • Started November 9, 2020
    Started by Tim Mies
    Completed January 14, 2022
    Completed by Lanz Inc.