Install Low Flow Fixtures throughout Campus (Ongoing)
Recent Project Updates
-
6/2/2020An updated inventory of low-flow fixtures in campus buildings was provided in June 2020. In this spreadsheet, the fixtures are organized with respect to the building, room number, use description, and more.This document will be continuously...
-
12/12/2018The F&S Plumbing shop plans to begin installation of the 1.6-gallon units on 1/2/2019. The F&S Plumbing shop came up with an estimate to replace all the toilets (12) and four urinals at the Undergraduate Library with 1.6-gallon per...